The BEST TECHNOLOGY in Wastewater and Sludge Treatment
water-treatment
Wastewater analysis results
The Tests have been conducted by New Water Technology Inc and Flo-Clear Water Systems Inc. at Piney Point Reservoirsite on August 30th, Aug 31st , and Sept 1st, 2022. For the wastewater treatment we used our Prototype Treatment Station (PWTS-05) with a capacity of 0.5 gallons/min. The clean water obtained after the treatment of the effluent has been sent for testing to the Authorized Laboratories in Florida (see Piney Point Reservoir, Florida, U.S.A. in the PROJECTS page).