The BEST TECHNOLOGY in Wastewater and Sludge Treatment
water-treatment
Wastewater analysis results
The Tests have been conducted by New Water Technology Inc and Flo-Clear Water Systems Inc. at Piney Point Reservoir  site on August 30th, Aug 31st , and Sept 1st, 2022. For the wastewater treatment we used our Prototype Treatment Station (PWTS-05) with a capacity of 0.5 gallons/min. The clean water obtained after the treatment of the effluent has been sent for testing to the Authorized Laboratories in Florida (see Piney Point Reservoir, Florida, U.S.A. in the PROJECTS page).
PRIVACY POLICY   l   TERMS & CONDITIONS   l   COOKIES                                                                                                          Web & Graphic design: www.design-office.ro
Piney Point sample     TESTS RESULTS     Analyte   Result        [g/L]   MDL      [g/L]       Analyte   Result        [g/L]   MDL    [g/L]   PHOSPHOROUS           249,000    0     Phosphorous           3,230    8   NITRATE                2,250    20     Nitrate   < 20   20   NITRITE   < 20   20     Nitrite   < 20   20   ARSENIC   53.6   6.02     ARSENIC   6.02 (U)   6.02   CADMIUM   2.50   0.9     CADMIUM   0.9 (I)   0.9   CHROMIUM   8.7   2     CHROMIUM   2 (U)   2   MOLYBDENUM   2   2     MOLYBDENUM   2 (U)   2   NICKEL   78.4   1.18     NICKEL   2.40 (U)   1.18   SILVER   0.5   0.5     SILVER   2.9   0.5   ZINC   16.8   1.4     ZINC   1.4 (U)   1.4   MERCURY   0.198   0.198     MERCURY   0.198 (U)   0.198   COPPER   1.38   0.346     COPPER   6.19   0.346   LEAD   1.93   0.67     LEAD   0.67 (U)   0.67   SELENIUM   1.57   1.57     SELENIUM   1.57 (U)   1.57